By visiting our site, you agree to our privacy policy regarding cookies, tracking statistics, etc. Read more

Haarlem Electricians

+31 (0) 655514213

info@HaarlemElectricians.nl

Spaarnwouderstraat 85rood

2011 AC Haarlem

Mon - Fri 9.00 - 17.00 office

24 hour Call out

  • HOME
  • DOMESTIC SERVICES
    • Installation of new distribution board
    • LIGHTING
    • POWER
      • NEW CIRCUIT
      • FULL RE-WIRE
    • HEATING AND VENTILATION
      • Heat recovery systems
    • DATA NETWORKS & AUTOMATION
  • Electrical Condition/safety report
  • 24-HOUR EMERGENCY CALL-OUT
  • COMMERCIAL SERVICES
  • MOST CITIES COVERED
  • RATES
  • CONTACT

+31 (0) 655514213

info@HaarlemElectricians.nl

Spaarnwouderstraat 85rood

2011 AC Haarlem

Mon - Fri 9.00 - 17.00 office

24 hour Call out

Portfolio

Portfolio Hubert 11th December 2021 30th January 2023

  • Default
  • Date
  • Title
  • Random
  • Ascending
  • Descending
  • ALL
  • Fault Finding
  • socket outlet install
  • Emergency call out
  • Circuit install
  • Testimonials
  • Data
  • New distribution board
  • Light install
  • adding ground cable
  • Security camera install
  • Other
  • Quote

2023-02-09 13:32:16

91

Damage circuit

Damage circuit

  • Damage circuit

2/2/2023 On site 0915 off site 1045 Issue Signs of burning around the socket Corrective actions Checked the cable for signs of overheating in the distribution board for the circuit all looks, 16 amp breaker correctly size, cable size correct Conclusion, faulty electrical charge are used this caused the overheating and socket Replace the socket with a double socket outlet and used three connectors and a bit of sacrificial cable. In case it happens again, client has new electrical car charger

€100

2023-02-09 13:29:17

90

Install two new monitoring metres and three phase circuit

Install two new monitoring metres and three phase circuit

6/2/2023 on site 0918 off site 1320 clock stoped at 1300 Request

Fit 2 monitoring metres on 2 3 phase circuits Actions Installed 2 housing unit and altered circuits, accordingly units, tested and working correctly. Client witnessed

€200

2023-02-09 13:11:59

89

New circuit and correct old wiring

New circuit and correct old wiring

7/2/2023 on site 0921 off site 1612 1. Install connection box 2. Dressed incoming cable to wall 3. Identified phases and put in correct rotation 4. Installed new circuit to left-hand side of workshop to feed new socket outlets old circuit.was not installed correctly and had no ground 5. Advise client on wiring home

€350

2023-02-09 12:55:40

88

Installation of three-phase circuit for new hob

Installation of three-phase circuit for new hob

  • Installation of three-phase circuit for new hob
  • Installation of three-phase circuit for new hob
  • Installation of three-phase circuit for new hob

8/2/2023 on site 1123 off site 1410 onsite 1655 off site 1759 1. Fitted 3 m of trunking going from meter cupboard to void next to kitchen 2. 3 Penetrations from meter cupboard to cupboard under and from cupboard under stairs, to void from void to kitchen. 3. Fitted flexible, conduit in meter cupboard, and flexible, conduit on floor of kitchen 4, Fed 11 m of three. Core 2.5 mm cable from meter cupboard to hob 5. Terminated hob, and with IP rated Parallex outlet 6. Terminated to 16 amp breakers in meter cupboard. Needed to put link cables to earth leakage device. 7. Tested circuit past client witnessed. 8. Removed old socket circuit in Kitchen Observations 70% of circuits in the distribution board are not covered by the Earth leakage device. This is dangerous and should be rectified. No main isolator in distribution board, not up to current regulations Distribution board has C rated 16 amp breakers. This is not correct for the size of cable and should be rectified. fuse board is old and needs updating. Two new fuses are a temporary solution until the tree phase board is installed

€175

2023-02-09 12:48:09

87

Emergency call loss of power

Emergency call loss of power

8/2/2023 Call at 1018 Travel start 1040 On site at 1100 off site 1133 Issue no power to half the house Corrective actions 1. After checking light, it was found at neutral, was disconnected to the rest of the house reconnected neutral power restored 2. Installed light, correctly 3. Advise client on induction hob and how to solve issue with not enough power in the kitchen

€150

2023-01-30 12:11:09

86

Connecting apartment block to ground

Connecting apartment block to ground

  • Connecting apartment block to ground
  • Connecting apartment block to ground

installed ground cable from lower apartment to 1st floor this was able to feed other apartments tested first floor apartment and third floor apartment, all past

€150

2023-01-30 12:01:46

82

Emergency callout smell of burning coming from the distribution

Emergency callout smell of burning coming from the distribution

30/1/ 2023on site 1415 off site 1450 Issues Sign of burning on the main isolator Corrective actions Replaced faulty, main isolator and 40 amp cable Probable cause cable not secured correctly in

€150

2023-01-30 11:44:23

81

New 8 group, three-phase distribution board

New 8 group, three-phase distribution board

30/1/2023 Installed an eight group three-phase distribution board Installed 24 V AC bell Circuits in outside building disconnected and isolated more investigation needed as it was not safe

€1060.92

2023-01-30 11:29:30

80

No power in Kitchen

No power in Kitchen

30/1/2023 on site 0915 off site 1018 Minimum two hour callout applied Issue No power in kitchen Corrective actions Check Distribution board, fuse found have failed, after changing fuse power restored. Observations Distribution board 70 years old needs updating

€100

2022-03-19 07:05:35

79

Preparation for new circuits

Preparation for new circuits

  • Preparation for new circuits
  • Preparation for new circuits
  • Preparation for new circuits

18/2/2022 On site 0930 off site 1406 on site 1517 off site 1804 1. Advise client on power allocation throughout the house 2. Fitted fan in bathroom 3. Fitted lights in hall 4. Chase wall in the kitchen for extending cable to new position of oven and installed back box and flex conduit. 5.Chase wall in the kitchen for extending cable to new position of socket outlet and installed flex conduit. 6.Chase wall in the kitchen for extending cable to new position of extract fan and installed back box and flex conduit

€350

2022-03-19 06:55:31

78

Installation of new thermostat

Installation of new thermostat

  • Installation of new thermostat
  • Installation of new thermostat

15/2/2022 On-site 0900 offsite 1030 1. Removed Old thermostat repurposed feed cables for new term stat 2. Fitted control box to boiler and connected to new term start tested past and client witnessed 3. Advise client on new lights got one old light working again

€100

2022-03-19 06:48:28

77

Prior inspection to rewire to remove connections below new floor

Prior inspection to rewire to remove connections below new floor

14/2/2022 0n site 0905 off site 1100 Lifted floorboards and Inspected ceiling void and conduits ready for next visit to install new cabling to enable removal off boxes

€100

2022-03-19 06:38:06

76

loss of power on top floor

loss of power on top floor

  • loss of power on top floor
  • loss of power on top floor
  • loss of power on top floor

11/2/2022 On site 0903 off site 1506 issue: No power in the top half of the house three electricians before me I tried to solve the problem. Observations: Because of multiple flooring on the top floor attic space it was agreed with the client not practical to lift the flooring to find the issue. This left one option to go through the ceiling of the floor below to try and find the issue. Corrective actions: 1. Probable contributing factor to cause of burnt cable was a high impedance because of no ground cable in the distribution board this will need to be rectified using a earthing rod reading was 1120 ohms client witness test 2. In an effort to try and find the supply cable to the circuit that was not functioning I drilled access holes in several parts of the ceiling these holes could also be used to pull in a new circuit if we could not resolve the fault on the original circuit. 3. The wiring standard observed via the access holes was not good practice connections in boxes that could not be accessed for maintenance or fault finding this will have to be rectified. 4. The feed for the cable in fault could not be located without more intrusive/destructive work. It was agreed with the client to stop as we now had access to all cables feeding the socket outlets and light and we would re-feed the circuit with a new supply from the distribution board and at the same time pulling a second supply to feed the washer dryer. A date has been agreed to return and started work

€300

2022-03-19 06:32:30

75

new circuits

new circuits

11/2/2022 on site 1407 off site 1636 1.Traced switch lines from upstairs to hidden switch box beside behind plaster downstairs beside the toilet. 2. Re-rooted switch lines two meter cast and installed in flexible conduit 3. Installed switch for upstairs 4. Traced and redirected 5 core Cable to serve kitchen area and be to be fed from distribution board. 5. Installed two light switches one in toilet one in hall both tested. 6. Checked over clients requirements for power consumption in kitchen and advised on three circuits totalling 10.2 kW of available power one of the circuits will has been pulled in for future use and coiled up over ceiling next to kitchen area and other items left in distribution board (washing machine dryer) 6. Removed temporary Power link cable serving upstairs lights connected permanent switch lines and dressed socket back box. 7. Dressed and made safe cables in meter cast.

€225

2022-03-19 06:22:33

74

install door bell

install door bell

Minimum two hour call applied 1. Installed doorbell and transformer tested client witnessed

€100

2022-03-19 06:18:29

73

On-site 1305 offsite 1. Fitted light in master bedroom 2. Check doorbell battery needed changing now working correctly 3. Fitted light child bedroom 4 fitted light sitting room

€100

2022-02-14 12:34:21

72

install light and vac

install light and vac

7/2/2022 On-site 0900 offsite 1215 1 Removed old dining room light replaced with new

€175
2 put up shelf in sitting room 3 tested circuit in shed passed client witnessed 4. Remove cables from sitting room floor 5. Advise to heating thermostat
€175

2022-02-14 12:31:48

71

no ground in most of house

no ground in most of house

9/2/2022 On site 0912 offsite 1532 Issue: All sockets except for one next to distribution board failed residual current test: Corrective actions: 1. Socket next to distribution board had outgoing ground cable removed this was the disguise and ground fault in the rest of the circuit. Connected outgoing ground cable and then went on to disconnect all main wiring nodes until fault isolated in spare bedroom top of house. Isolated Circuit leg ground cable, all other sockets with ground past residual current test client witnessed. 2. Kitchen Circuit had lost ground connection and due to the construction of house it would have taken excessive amount of destructive and disruptive work to find the break in the ground cable. Advice to client was to feed a ground cable from the distribution board to the kitchen. After adding the ground cable this resolved the issues in the kitchen. All sockets with ground cables including in the outside shed passed over voltage and residual current tests client witnessed.

€300

2022-02-14 12:25:37

70

light socket install, fault finding

light socket install, fault finding

  • light socket install, fault finding
  • light socket install, fault finding
  • light socket install, fault finding
  • light socket install, fault finding

8/2/2022 on site 0933 off site 1432 1.Rewired hall switch and first floor landing switch so 2 way switching worked correctly 2. Issue no power in socket in cupboard, On examination of switch the neutral cable had been completely destroyed from switch to main wiring node(this was hidden underneath the panelling in the cupboard) probable cause overloading. 3. Loss of power to the top floor due to the previous issue. Located cables feeding the top floor and connect them directly to the main wiring node in the hall. 4. Sockets in multiple locations had back boxes that were not in good condition advised client possible solutions, .1 change the type of plug to ones that use anchoring point on the side 2. to use wood screws 3. Change the back box to new. 5. Two lights in the kitchen that were not working had been fitted with 230 V LEDs when they should've been 12 V

€250

2022-02-14 12:17:07

69

light and socket switch install

light and socket switch install

  • light and socket switch install
  • light and socket switch install
  • light and socket switch install
  • light and socket switch install
  • light and socket switch install
  • light and socket switch install
  • light and socket switch install
  • light and socket switch install
  • light and socket switch install

8/2/2022 on-site 0912 off site 1343 1. Removed old switch and socket by sink 2. Installed new switch line to serve new light over sink 3 install two new switches by sink 4. Install conduit from light to IP rated box 5 Fed new switch line cable from new switch to light over sink 6. Installed new light over sink 7. Installed new IP rated connection box by washing machine 8 Install cable from socket outlet by washing machine through the wall to feed outside sockets 9 installed outside sockets

€225

2022-02-14 07:02:52

68

3/2/2022 On site 1205 off site 1400 Install six lights in six rooms Install smoke detector

€100

2022-02-14 07:00:01

67

Install new ceiling light

Install new ceiling light

Removed old light fitting Hung new light fitting extra cable hidden in ceiling rose Advised On data network

€100

2022-02-14 06:54:18

63

New sockets and fault on existing circuit

New sockets and fault on existing circuit

  • New sockets and fault on existing circuit
  • New sockets and fault on existing circuit
  • New sockets and fault on existing circuit
  • New sockets and fault on existing circuit
  • New sockets and fault on existing circuit

3/2/2022 On site 0900 1230 1. Drilled hole and installed cabling from inside to outside 2. Install two double sockets wired and tested passed client witnessed 3. Installed new cover and socket outlet over outside socket next to front door and tested passed client witnessed 4. Checked transformer will need you will order and return 5. Installed new IP rated connection box and retaining clips for cables changed cable connectors.

€175

2022-02-06 08:58:40

61

Hotel switching wired incorrectly

Hotel switching wired incorrectly

1/2/2022 On site 1307 off site 1425 1. No power into socket after testing it was found wiring was wrong and went via a switch on Rewired the two sockets tested and passed client witnessed 2. Hotel switching on landing was wired incorrectly fixed rewired new switch all working correctly

€175

2022-02-06 08:49:16

60

Downlights not working correctly

Downlights not working correctly

First of February 2022 On site 0846 offside 1000 1. Client complained of loss of power tested socket found retaining clips had loose and probably causing arcing tighten clips 2. Download spotlight not working correctly after inspecting switch conclusion needed replacing 3. Two way switch times two on hallway need replacing

€100

2022-02-06 07:52:24

59

install lights and extractor fans

install lights and extractor fans

  • install lights and extractor fans
  • install lights and extractor fans
  • install lights and extractor fans
  • install lights and extractor fans
  • install lights and extractor fans
  • install lights and extractor fans
  • install lights and extractor fans
  • install lights and extractor fans

31/1/2022 On site 0907 off site 1723 1.Installed 2 lights in bed room( back plate not big enough so had to screws 2. Installed two wall lights over sinks to avoid drilling tiles I I altered back plate on fitting to attach to back box in wall and one ceiling light in Bathroom 3. Installed lights in the Master bedroom needed to alter back bracket to make it fit 4. Removed old toilet extractor fan replaced with new altered cable to facilitate 5. Install light in Toilet 6. Installed dining room light 7. Installed pendant light in Kitchen 8 inspected route for new circuits to feed kitchen not possible from first floor as boards glued can’t lift

€425

2022-01-30 09:00:30

58

17/12/2021 Minimum two hour call out applied Issue Down lights in kitchen not working Corrective action Tested lights transformer found to be malfunctioning replace transformer lights working correctly.

€100

2022-01-30 08:57:02

57

Change light level

Change light level

17/dec/2021 Minimum two hour call out applied Issue Neighbours complaining about how bright the lights in the courtyard are Corrective actions Made light diffusers orange this will take down the level of light.

€100

2022-01-30 08:54:49

56

Install light in garage

Install light in garage

21/Dec/2021 minimum 2 hour call out applied installed lights in garage fix light not working garage advise on light out side

€100

2022-01-30 08:51:49

55

Nuisance tripping

Nuisance tripping

22/dec/2021 on site 0929 off site 1047 issue: lost power Corrective actions: Tested socket outlets and lights on ground floor and Second floor outside patios. Also checked the grill in kitchen. Reconnected outside lights and they working correctly Observations: All sockets and outlets lights tested fine except for the outside socket outlet on the ground floor it had a high loop impedance result this could prevent the over-voltage protection working correctly. On the griddle the left-hand element has a fault that is shorting to earth causing nuisance tripping. Recommendations: Replace the heating element on the griddle. Avoid using downstairs socket outlet or locate issue causing high impedance.

€100

2022-01-30 08:43:52

54

Wire flex outlets for 2 cookers, Parallex and 230v

Wire flex outlets for 2 cookers, Parallex and 230v

Minimum two hour call out applied Tested socket outlet and new leads to correctly identify all polarity is correct wired to cookers

€100

2022-01-30 08:37:28

53

loss of power part of the distribution board

loss of power part of the distribution board

Two hour minimum callout applied issue: no power on 4 fuses Corrective actions: Tested distribution board one of the phase head fuses had blown. Change fuse, all power restored

€150

2022-01-29 14:51:46

52

Loss of power to part of the distribution board

Loss of power to part of the distribution board

travel start 1602 on site 1615 off site 1646 issue: loss of power on part of the board corrective action: checked distribution board found incoming phase not working, reset head fuse all power restored

€150

2022-01-29 14:34:10

51

Loss of power to part of the distribution board

Loss of power to part of the distribution board

31/12/2021 travel start 1300 on site 1309 off site off site 1322 issue: lost of power on part of the distribution board Corrective action: tested power on the board and found one phase not working changed fuse all power restored

€150

2022-01-29 14:21:02

50

Installation of security camera and lights

Installation of security camera and lights

  • Installation of security camera and lights
  • Installation of security camera and lights
  • Installation of security camera and lights

10/12022 On site 0912 off site 1350 Installed one light with difficult to access over stairs top floor Installed 2 lights in Front bedroom one of which box had only one bolt hole available One light on landing only one bolt hole available Drilled 20mm hole and Installed one camera on outside of garage

€175

2022-01-26 04:39:57

49

install lights

install lights

  • install lights
  • install lights
  • install lights

1/1/2022 on site 0907 off site 1219 Removed four lights from old address and transported into new property Installed light in dining area had to add meter of cable to ceiling trunking to get to the required position Installed light in child's bedroom altered height to clients specifications Installed Light in hall altered light hight to customers specification

€175

2022-01-26 04:26:58

48

Moving sockets and adding ground cable

Moving sockets and adding ground cable

  • Moving sockets and adding ground cable
  • Moving sockets and adding ground cable

18/1/2022 on site 0903 off site 1700 1.Removed light to gain access to main wiring node. 2.Removed hotel switching and cabling ready for plastering 3. Chased concrete wall (made more difficult by type of concrete) for extension of sockets and new double socket outlets back boxes, Secure new back boxes and flex conduit in place with snail Gips. 4. Removed all cables and rewired circuits with the addition of an ground cable. 5. Altered light circuit to function only on room switch and replaced light 6. Tested all sockets all passed Clyde witnessed

€400

2022-01-26 04:20:36

47

install new circuits

install new circuits

19/1/2021 on site 0858 off site 1300 1. installed 2 drying boxes for and connected circuits in kitchen 2. tidy up concrete chases in kitchen ready for flexible conduit back boxes . 3. Laser level and Installed 5 back boxes , flex conduit with snel gips for countertop in kitchen 4. puled in wires for 2 countertop sockets 5. Fix Parallex socket outlet back box and flex conduit 6. Wired parallax socket outlet. 7. Advised on network and routing for PV panels cabling and pulled in coax cable Return to site at 1550 to install circuit for fridge two man job nobody else there could not complete

€200

2022-01-26 04:13:12

46

Loss of power in circuit

Loss of power in circuit

20/1/2022 Confirmation text received 1715 travel start 1720 on site 1730 off site 1801 Issue as described by client: Our shed has lost electricity which is where our CV kettle/heater is located. The beaker box does not show an outage Corrective actions: Check the the shed made sure all items were unplugged checked the condition of cabling and socket outlets Checked the distribution board found fuse had blown probable cause of this was an over load due to an old clothes dryer drawing 3.3 kW recommendation to update this to a dryer that has less than 1.5 kW to keep it within the required wattage. Change the fuse all power restored.

€150

2022-01-25 07:10:53

45

install security camera

install security camera

  • install security camera
  • install security camera

20th/1/ 2022 on site 0913 off site 1347 1 Install conduit 9 m and saddles 2 install camera 3 Wired camera and fed from connection box 4. Fix hotel switching 5. Installed new socket outlet outside 6. Rewired fuse board so all circuits go via the residual current device Observations Distribution board and residual current device are 60 years old or over Recommendations Because of the age update distribution board and residual current device

€225

2022-01-11 06:26:18

44

installed 4 lights

installed 4 lights

  • installed 4 lights

10/1/2020 on site 1415 off site 1543 Installed one light in hall concrete ceiling install one light in sitting room concrete ceiling Install two lights in bedroom concrete ceiling

€250

2022-01-11 06:09:30

34

install 4 lights and Camera

install 4 lights and Camera

  • install 4 lights and Camera
  • install 4 lights and Camera
  • install 4 lights and Camera
  • install 4 lights and Camera
  • install 4 lights and Camera

10/12022 On site 0912 off site 1350 Installed one light with difficult to access over stairs top floor Installed 2 lights in Front bedroom one of which box had only one bolt hole available One light on landing only one bolt hole available Drilled 20mm hole and Installed one camera on outside of garage

€175

2021-12-21 13:47:42

25

get power and data on on right side of office

get power and data on on right side of office

  • get power and data on on right side of office

17/12/2021 on site 0915 off site 1352 request: get power and data on on right side of office Actions: Changed light switch to switch and socket, re-feed cables from main wiring node to switch Drill a hole through concrete ceiling in sitting room and fed cat six cable to office area using trunking terminated with RJ 45 connection box and tested cable client witness

€250

2021-12-21 13:44:11

24

Igniter on stove continuously activating

Igniter on stove continuously activating

18/12/2021 Minimum one hour call out applied Issue Gas igniter on stove kept engaging Corrective actions Removed hob but could not gain access to an internal components agreed with client to leave isolated hob this has the effect of stopping the clicking

€150

2021-12-21 13:42:03

23

downlight not working

downlight not working

17/12/2021 Minimum two hour call out applied Issue Downlights in kitchen not working Corrective action Tested lights transformer found to be malfunctioning replace transformer lights working correctly

€100

2021-12-21 13:35:49

22

install outside socket outlet

install outside socket outlet

  • install outside socket outlet
  • install outside socket outlet

20th/December/ 2021 On site 08 55 offsite 1328 Request: Install socket outside to enable car charging. Actions: Install cabling from meter cast via crawlspace to outside wall Installed switch and socket outlet Tested washing machine circuit failed discussed with client that (RCBO residual current device with overcurren.protectiion) (AARDLEKSCHAKELAAR) was functioning correctly. Purchased new RCBO replaced and tested this time past client witnessed. Tested outside socket past client witnessed. Observations: The distribution board is old and while testing for loop resistance I got an reading of 2.49 ohms on two of the circuits Recommendations: Replace the distribution board at the same time investigate the high loop readings

€225

2021-12-17 06:36:03

17

Installation of socket outlet and hung mirror

Installation of socket outlet and hung mirror

  • Installation of socket outlet and hung mirror
  • Installation of socket outlet and hung mirror
  • Installation of socket outlet and hung mirror

17/dec/2021 on site 0914 off site 1251 on site 1559 off site 1653 chase wall 4 meters installed double socket outlet, cabling and new backbone for old socket filled wall chase some filling and sanding left to client tested sockets past client witness hung mirror

€150

2021-12-15 06:34:06

13

Emergency call out

Emergency call out

9.12.2021 At clients address within 15 minutes issue: lost of power Corrective action: Probable cause of power outage was malfunctioning oven change to 16 amp fuse and reinstate the power

€150

2021-12-15 06:26:13

12

Nuisance tripping on kitchen circuit

Nuisance tripping on kitchen circuit

On site 1504 off site 1730 Issue: Nuisance tripping on circuit serving kitchen downstairs and outside shed. Corrective actions: Circuit feeding shed was encased in concrete and could not be access, so had to disconnect circuit in socket next to back door. After disconnecting circuit and reenergised distribution board nuisance tripping had stopped. Observations: Tested circuit and found residual current device did not trip in the required 30 mA also found a value of 158ohms Recommendations: The above results indicate an issue with the earthing system that needs to be resolved and was the possible contributing factor of the oversupply of current to the shed that caused the cable to short circuit. The fault needs to be rectified as soon as possible as it forms part of the protection for the property and persons. The distribution board is also 30 years and needs to be updated

€125

2021-12-15 06:20:29

10

Installation of heated towel rail

Installation of heated towel rail

  • Installation of heated towel rail

15/12/2021 on site 0914 off site 1446 Fitted towel rail in bathroom, feed from bedroom circuit. Fitted new socket outlet in bedroom opposite towel rail. Replaced light bathroom mirror light

€275

2021-12-14 07:42:22

9

Installation of sockets and lights

Installation of sockets and lights

  • Installation of sockets and lights
  • Installation of sockets and lights
  • Installation of sockets and lights
  • Installation of sockets and lights

13/12/2021 on site 0906 off site 1648 installed conduit, cabling and 2 connection boxes Installed two lights, switch, two sockets and overhead heater. tested sockets residual current device (RCD) passed client witness High loop value 11.58 ohms found on the 2 circuits, tested socket inside kitchen found the same high resistance value. Recommendations: Find the cause of the high ohms value and resolve as this can lead slow or no disconnection of the miniature circuit breaker negating your protection. see link, explain why you need a good working MCB https://www.electgo.com/what-is-mcb/

€400

2021-12-11 11:59:11

1

Installation of socket outlet and mirror

Installation of socket outlet and mirror

  • Installation of socket outlet and mirror

10.12.2021 On-site 0900 offsite 1356 Used circuit in bedroom as permanent feed for mirror and socket chased channel to precise position and drilled through to bathroom. Fitted mirror and then socket to required locations. Tested socket, past and witnessed by client. Filled chased channel in wall and agreed with client that they would do final sanding painting Filled hole in ceiling in bedroom Advised on lamp in toilet

€200

COMPANY INFORMATION

KVK : 73212849

IBAN: NL79 ABNA 0833 5741 67

Terms and Conditions
INFO@Haarlemelectricians.nl

VOL-VCA

J.I.B. Approved Electricians C0098010